Good Morning,
I am having an issue determining a problem I am having when I run xtnbreg. To be brief, I am running two models: The first model has no issues; however, in the second model I convert my two main independent variables to change variables and the model does not achieve convergence. Instead I get a continuous number of iterations and nothing else has changed. I have played with the data and pulled out each control variable individually and I believe I have determined which control variable may be the issue. In addition, I have checked for collinearity with my variables and there is no issue.
My big problem here is that the control variable that I believe is an issue is measured on a scale from 0 to 1 (calculated as a decimal i.e. .787, etc.) and I need to keep it this way. I have multiplied this control by 1,000 to eliminate the decimal just to see if this would have an impact and the models worked.
Any thoughts, suggestions, ideas, etc are much appreciated.
I am having an issue determining a problem I am having when I run xtnbreg. To be brief, I am running two models: The first model has no issues; however, in the second model I convert my two main independent variables to change variables and the model does not achieve convergence. Instead I get a continuous number of iterations and nothing else has changed. I have played with the data and pulled out each control variable individually and I believe I have determined which control variable may be the issue. In addition, I have checked for collinearity with my variables and there is no issue.
My big problem here is that the control variable that I believe is an issue is measured on a scale from 0 to 1 (calculated as a decimal i.e. .787, etc.) and I need to keep it this way. I have multiplied this control by 1,000 to eliminate the decimal just to see if this would have an impact and the models worked.
Any thoughts, suggestions, ideas, etc are much appreciated.
Comment