I'm estimating a dynamic panel model (n=20 and T=15) with GMM system. The dependent varaible is the rate of growth and the main independent variable is migration flow.
In this type of model to control for the source of endogeneity of migration, this is generally intrumented with a shift-share instrument.
I was wondering if I can use such instrument in a dynamic GMM estimation given that this procedure uses internal lagged instruments.
thanks
In this type of model to control for the source of endogeneity of migration, this is generally intrumented with a shift-share instrument.
I was wondering if I can use such instrument in a dynamic GMM estimation given that this procedure uses internal lagged instruments.
thanks

Comment