    Hello,
    I'm estimating a panel fe model using instrumental variable
    I've instrumented my endogenous variable X(t-1) with Z(t-1)
    However, I've also used Z(t-1) togheter with Z(t-2), and estimation results are much better.
    I'm not sure that this is fine. Are there any problems of including Z(t-2) too?
    Thanks

  • #2
    The validity of instruments is determined from outside of the model, from prior reasoning.

    Hence this is not a question that is possible to answer just on the basis of the precedence information you provide.

    Comment


    • #3
      Hello Joro,
      sorry I was not clear. The economic justification from using Z as instrument is reasonable. Also the statsistical tests show that the instruments Z(t-1) and Z(t-2) are valid when used togherer.
      And, as I said, when using both estimation results are much better.
      So my only worried is if they can be used simultaneously
      Thanks

      Comment


      • #4
        Yes, of course they can be used simultaneously, if you think that both of them taken separately are valid instruments.

        Comment


        • #5
          Thanks a lot Joro,
          really appreciated your help